Currently, start dates do not show up in the Calendar Power-up. Will the calendar power-up get a start date integration similar to the one for calendar view (card stretched from start to end date)? That would be great!
System for Calendar View (This would be great if it was also in the calendar power-up)
On a related note, Start dates currently feel tacked on and awkward. The start and due date options are separate buttons and do not work together. I think they should be incorporated into a singular 'date' button.
Start and due date are separate (should be integrated with one another)
I don’t think the Calendar Power-Up will get those features as we have separate code for the views and the future features will all going into the View code.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.