I was trying to figure out how to configure Jira 5.2 to show me the overall project's story point build-up/burn-up chart for a scrum board.
At present, Jira 5.2 can be configured to show the story point burndown for a single sprint.
But I need to see the burn-up (or even a burn-down) across sprints.
In other words, if a project comprises of 3 sprints and overall 80 story points and in sprint 1, the team delivered 20 story points, in sprint 2, 30 story points and in sprint 3, 20 story points, I should be able to see the cumulative buildup/burn-up of 70 points that the team delivered out of the total 80 story points in a chart with X-axis being sprint number and Y-axis being the total story points.
Is that something that can be configured in the current Jira 5.2? If no, is there a plugin for it?
Hey there, Arun.
As of now, neither JIRA nor GreenHopper has the ability to show the Burndown Chart for all / multple sprints in that particular project. However, there is already an open ticket that is discussing this matter. Make sure you add yourself as a watcher and vote for it too:
Hope this helps to clear things on your side.
Warm regards,
Danial
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hey there, Arun.
You are welcome. Glad to be able to help you with it.
Warm regards,
Danial
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.