Since we got the version 2.8.1 of Time sheet with JIRA 5.2.11 (previous was 2.2.9 with JIRA 4.4.5), the generation of the report is very long. Many minutes are needed to generate, no matter the range of the choosen date.
Have you received simuliar questions ?
Hi Emmanual,
Please take a look at https://bitbucket.org/azhdanov/jiratimesheet/wiki/JRA-32510%20Timesheet%20report%20time-out%20workaround. Does it help?
Thank you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.