Are you in the loop? Keep up with the latest by making sure you're subscribed to Community Announcements. Just click Watch and select Articles.

×
Create
cancel
Showing results for 
Search instead for 
Did you mean: 
Sign up Log in
Celebration

Earn badges and make progress

You're on your way to the next level! Join the Kudos program to earn points and save your progress.

Deleted user Avatar
Deleted user

Level 1: Seed

25 / 150 points

Next: Root

Avatar

1 badge earned

Collect

Participate in fun challenges

Challenges come and go, but your rewards stay with you. Do more to earn more!

Challenges
Coins

Gift kudos to your peers

What goes around comes around! Share the love by gifting kudos to your peers.

Recognition
Ribbon

Rise up in the ranks

Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!

Leaderboard

abc.png

i want to show estimation on view, the same as Summary, priority, assignee, and status. it's possible?

2 answers

0 votes
Nic Brough -Adaptavist-
Community Leader
Community Leader
Community Leaders are connectors, ambassadors, and mentors. On the online community, they serve as thought leaders, product experts, and moderators.
Jul 07, 2022

Which view is this in?  Backlog?  Subtaks? Something else?

Nic Brough -Adaptavist-
Community Leader
Community Leader
Community Leaders are connectors, ambassadors, and mentors. On the online community, they serve as thought leaders, product experts, and moderators.
Sep 11, 2023

What is the estimation statistic?

Also, the field in the middle is too long for a summary, so I suspect you have added a long text field (which seems to contain a lot of redundant data that is probably best handled outside the text).

Try swapping that text field back to using the summary, I suspect the text may be overflowing over the estimate.

@Nic Brough -Adaptavist- it's mean I want to show the story point in that line.
where i can set up the add field Story point? same like Key, Summary, priority, assignee, and status

Nic Brough -Adaptavist-
Community Leader
Community Leader
Community Leaders are connectors, ambassadors, and mentors. On the online community, they serve as thought leaders, product experts, and moderators.
Sep 11, 2023

Ok, so I assume your estimation is set to Story points.

Three things to do.  Go into board setting and:

  • In the "Estimation" section check that it is set to Story Points, change it to SP if it is not
  • In the "Card Layout" section, look at the top half - the "backlog" section.  If there are any fields listed in there, make a note of them, and then remove them all (you can put them back later after testing this)
  • If you've got an issue to test with, find it in your backlog and check the SP value and set one if not.

What does the backlog look like now?

Suggest an answer

Log in or Sign up to answer