Which view is this in? Backlog? Subtaks? Something else?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What is the estimation statistic?
Also, the field in the middle is too long for a summary, so I suspect you have added a long text field (which seems to contain a lot of redundant data that is probably best handled outside the text).
Try swapping that text field back to using the summary, I suspect the text may be overflowing over the estimate.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@Nic Brough -Adaptavist- it's mean I want to show the story point in that line.
where i can set up the add field Story point? same like Key, Summary, priority, assignee, and status
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ok, so I assume your estimation is set to Story points.
Three things to do. Go into board setting and:
What does the backlog look like now?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.