You're on your way to the next level! Join the Kudos program to earn points and save your progress.
Level 1: Seed
25 / 150 points
Next: Root
1 badge earned
Challenges come and go, but your rewards stay with you. Do more to earn more!
What goes around comes around! Share the love by gifting kudos to your peers.
Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!
Join now to unlock these features and more
i want to show estimation on view, the same as Summary, priority, assignee, and status. it's possible?
Which view is this in? Backlog? Subtaks? Something else?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What is the estimation statistic?
Also, the field in the middle is too long for a summary, so I suspect you have added a long text field (which seems to contain a lot of redundant data that is probably best handled outside the text).
Try swapping that text field back to using the summary, I suspect the text may be overflowing over the estimate.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@Nic Brough -Adaptavist- it's mean I want to show the story point in that line.
where i can set up the add field Story point? same like Key, Summary, priority, assignee, and status
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ok, so I assume your estimation is set to Story points.
Three things to do. Go into board setting and:
What does the backlog look like now?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.