I have a task and several sub-tasks to it. Sub-tasks are assigned Original Estimates. When I check task, I can see in Time Tracking section Estimated value (checkbox include sub-tasks) that I want to be copied to the Original Estimate. How can I do that?
Thank you in advance,
Kristina
Hi @KS
Original estimate usually indicates the estimate of the issue. The time tracking may include all subtasks if you have checked the box that is. If you want to add the original estimates of all subtasks to the original estimate field of the parent, then you can achieve that via automation.