Can't enable Gantt Chart Plugin for Projects in JIRA 5.1.1

Constantin Quadt Aug 27, 2012

Hi

After I installed the JIRA Gantt-Chart Plugin as an evaluation verison I can't enable it in any project. Reason: The configuration button is missing.

Does anybody has a solution for this problem? Update? Other version of the plugin? Or am I something else missing here?

Thanks for support!

Kind regards

Constantin

4 answers

1 accepted

0 votes
Answer accepted
Frank Polscheit Sep 02, 2012

Please download and update to Gantt-Chart v.2.1.2 (JIRA 5.1.x) or v.2.0.3 (JIRA 5.0.x) having extended the permission aspect: both are functionally identical using the same source code but need different bindings.

Regards,
Frank

Constantin Quadt Sep 04, 2012

It works after the update!

Thanks for your support.

Regards,

Constantin

0 votes
Frank Polscheit Aug 27, 2012

Hi Constantin,

you must be a member of the project role "Administrators" related to this project LMS (membership of project roles are project-dependent) or a member of the JIRA group "jira-administrators".

Having renamed the role/group or using different ones beyond the standard JIRA setting out-of-the-box, need a corresponding Gantt-setting. This can be done via URL-call to gantt-settings passing the related group/role name as URL-parameter. As this is not very admin-user friendly, I have extended the Gantt-Chart AddOn concerning this feature and will publish it within the next version v.2.1.2 (JIRA 5.1.x) and v.2.0.3 (JIRA 5.0.x), soon.

If you contact me per email at frank@polscheit.de, I can send you the link for downloading the related JAR-file as part of my early-adapter-program, right now so that you are not blocked with waiting for my publishing.

Regards,
Frank

Constantin Quadt Aug 27, 2012

Hi Frank

Thanks for you answer! I have for all projects the role "Administrator" either as a group member of the "jira-administrators" or as single user the project role "Administrator".

If I didn't misunderstood you, it should work this way? Maybe you have another hint how my problem could be solved?

Best regards

Constantin

0 votes
Iver Grini Aug 29, 2012

Looks like the plugin does not behave properly with the plugin manager. It also has some issues with the license handling.

I was using an evaluation license which expired. Even though I entered a valid commercial license, the plugin would not work, still displaying a warning that the license was not valid (even though the plugin reported that it had a valid license when checking the configuration in the plugin manager).

I uninstalled the plugin, manually uploaded it and reapplied the license. The plugin then started working as expected.

Then, as described above, after updating the plugin manager, the plugin failed to enable.

Had to uninstall the plugin and manually upload the plugin file again (then reapplied the license). The plugin was then successfully enabled.....

Jira version 5.0.5, gantt plugin version 2.0.2, UPM version 2.6.1.

0 votes
Frank Polscheit Aug 29, 2012

Hi Iver,

thank you for your hint as I was not aware of this UPM-problem, getting no upfront feedback by Atlassian to upgrade and re-bind my plugin. Nevertheless, I upgraded the plugin's POM to use UPM 2.6.1 libraries and would like to test this within a separate environment before publishing. If you send me your contact details at frank@polscheit.de, I will send a pre-v.2.1.2 of my Gantt-Chart for validation.

Regards,
Frank

Suggest an answer

Log in or Sign up to answer
This widget could not be displayed.
This widget could not be displayed.
Community showcase
Posted in Marketplace Apps & Integrations

Demo Den Ep. 4: Continuous Integration with CircleCI & Jira Software

Get ready! Demo Den Episode 4 is coming your way on Tuesday, May 28, 2018 with a Continuous Integration and Delivery special demo. CircleCI Director of Solutions Engineering, Eddie Webb will show us ...

709 views 0 4
Join discussion

Community Events

Connect with like-minded Atlassian users at free events near you!

Find an event

Connect with like-minded Atlassian users at free events near you!

Unfortunately there are no Community Events near you at the moment.

Host an event

You're one step closer to meeting fellow Atlassian users at your local event. Learn more about Community Events

Events near you