We have one project, one board, but 20+ sprints for different modules. The challenge is that assigning issues to sprint from backlog ( right click or drag-n-drop ) is not easy as the sprint name hide behind the browser ( top ) and drag-n-drop - is too much of scrolling to be done.
Please suggest a way to simplify the assignment when more number of sprint is created in the board.
Below - post right click ( reduce font size to accommodate all sprint names ), there should be a way to scroll in the right click pop-up when the there are more sprints.
Screen Shot 2016-11-21 at 2.24.09 PM.png
With 100% zoom ( normal ) settings in laptop, some of the sprint name get's hide behind the browser top window.
Screen Shot 2016-11-21 at 2.28.19 PM.png
Thanks Nic Brough for your input. I have created additional board for same project. The sprint created is based on the different components and all sprint is visible in all boards created new ? How can I split existing sprint into multiple boards ?
I don't understand the first question in there. The second one is a manual piece of work, you'll need to create new sprints on the boards then move the issues for them into the new sprints.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I don't think there's much you can do about this. Planning sprints like that is not really what the system is designed for - normally, you'd have a board for each team or product, so there would only be a small handful of sprints. I think the best you can do is going to be have several boards with separate sprints.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.