Not sure if this is an issue in Portfolio 2.0, but I have the fix for the legacy version
Drove me crazy all day and just figured it out.
Under: Plan > Configure > Planning > Scheduling
Scroll all the way down to: "Maximum resources"
Increase the number of resources to the maximum you want to have collaborating on them at the same time.
Good luck!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.