• Community
  • Products
  • Jira
  • Questions
  • We have epics setup on a seperate project and it is mainly for Product Backlog. We also have a seperate project setup at team level. Can epics at team level be linked to the Product Backlog Epics?

We have epics setup on a seperate project and it is mainly for Product Backlog. We also have a seperate project setup at team level. Can epics at team level be linked to the Product Backlog Epics?

We have epics setup on a seperate project and it is mainly for Product Backlog. We also have a seperate project setup at team level. Can epics at team level be linked to the Product Backlog Epics? Because we don't want to link each individual stories at the team level to the epics in Product Backlog instead just link the epics at team level to the epics at Product Backlog level.

2 answers

Despite the extra functionality in Greenhopper Epics are "normal JIRA issues". Therefore you can link them any way you want

What I meant was can we establish link from an epic (project of low level requirements which contain a group of user stories) to an epic (another project but with higher level of requirements)? If it does work, then we don't have to link each user story at the low level to the high level epic.

Suggest an answer

Log in or Sign up to answer
Community showcase
Published Jan 08, 2019 in Jira

How to Jira for designers

I’m a designer on the Jira team. For a long time, I’ve fielded questions from other designers about how they should be using Jira Software with their design team. I’ve also heard feedback from other ...

914 views 3 9
Read article

Atlassian User Groups

Connect with like-minded Atlassian users at free events near you!

Find a group

Connect with like-minded Atlassian users at free events near you!

Find my local user group

Unfortunately there are no AUG chapters near you at the moment.

Start an AUG

You're one step closer to meeting fellow Atlassian users at your local meet up. Learn more about AUGs

Groups near you