Transitioning issue from post function results in workflow integrity error

profgrape September 28, 2017

We have a ScriptRunner plugin that includes a postfunction that will, under certain circumstances, initiate an additional transition for an issue.  

For example, imagine there's an issue that's currently in Status A.  A user initiates a transition, T0, to Status B.  A post-function for T0 determines that the issue should in turn, initiate another transition, T1, to Status C.  To the user, Status B is effectively skipped.

However, upon doing so, the issue Status is B despite the fact that both the issue history and currently available transitions suggest the issue in in Status C.  And the Integrity Checker reports the following for the issue:

"The current step associated with the workflow entry with id 20373 has an incorrect stepId. (JRA-4539)"

The issue is resolved by running the Fix.  But I'd like to know *why* this is happening in the first place.  The postfunction is the last item in the list and therefore, should work.

Has anyone else run into a problem like this?

2 answers

0 votes
profgrape September 29, 2017

After digging in a bit more, this looks like a race condition in JIRA.  So we ended up bailing on doing the transition in our plugin and instead, implemented it using the SR Fast-Track Transition post function.  It adds a bit of overhead when setting up a new workflow.  But it works!

0 votes
Steven F Behnke
Rising Star
Rising Star
Rising Stars are recognized for providing high-quality answers to other users. Rising Stars receive a certificate of achievement and are on the path to becoming Community Leaders.
September 28, 2017

How are you triggering the transition?

profgrape September 28, 2017

Here's a snippet of how we're performing the transition:

public static IssueService.IssueResult transitionIssue(MutableIssue issue, int transitionId, ApplicationUser user){
IssueInputParameters issueInputParameters = ComponentAccessor.getIssueService().newIssueInputParameters()
issueInputParameters.setSkipScreenCheck(true)

// Need to validate the transition before we can actually perform it.
IssueService.TransitionValidationResult validationResult = ComponentAccessor.getIssueService().validateTransition(user, issue.getId(), transitionId, issueInputParameters);

if (validationResult.isValid()) {
return ComponentAccessor.getIssueService().transition(user, validationResult)
}

log.error("Unable to validate transition!")

log.error(formatErrorCollection(validationResult.getErrorCollection()))

null
}

 I should note that our logs aren't reporting any errors (there's also a similar isValid() check on the result of the IssueService.transition() function).

Thanks!

Shaun