Hello!
My team has a Scrum board with story-based swimlanes. Unfortunately, only sub-tasks of that story are shown in the swimlane.
How can I make swimlanes based on stories to show all tickets that belong to story? E.g. linked under "belongs to" + subtasks.
I can’t think of any way to make this happen. Linked issues don’t really belong to a story. At least in the sense that sub tasks belong to a story. If the length issues really are required before story can be considered complete then maybe they should be sub tasks of the story?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.