When I set remaining estimate to 0h (using the UI or the setEstimate function) on a closed issue, the field is updated on the issue screeen (and in the TIMEESTIMATE field on the DB), but when I perform a JQL search using "remainingEstimate !=0" the issue is displayed in the results with a non 0 value.
e.g. Issue with original estimate set to 8h and logged work to 3h. The issue is closed and the remaining estimate is set to 0h. A search with "remainingEstimate !=0" displays the issue in the results with 5h as remaining estimate. Both JQLqueries and calls to the getEstimate API function return 5h.
WORKAROUND: I can get the correct blank value on a structure view (after running structure maintenance), but the value is still wrong in JQL searchs and Issue API.
Hi Alejandro,
Could you try to re-index JIRA and see whether the JQL search is still returning the wrong results?
Best regards,
Lenard
Hi Lenard,
Yes. Re-indexing seems to fix it.
It was tricky because I had several hundreds of issues on status closed and non-zero remaining estimate, and I was trying to set it to 0 on them programatically.
issues.each { issue ->;
// Update Issue
def myIssue = myIssueManager.getIssueObject(issue.getKey());
myIssue.setEstimate(0L);
myIssueManager.updateIssue(user, myIssue, EventDispatchOption.ISSUE_UPDATED, false)
}
Issues from at least 2 different projects were still showing in the query results with non-zero estimate.
I have re-indexed JIRA and now the results are correct.
Thanks,
Alejandro