The team was putting the original estimate at the story level as well as on the individual subtasks so there was an issue with "double dipping ". We deleted the Story level estimate but the sub task do not roll up to the story level now as they normally would. I need to know if there is a way to "refresh" the story and have those the original estimates on the subtasks roll up and populate at the story level.