I'm trying to set up a job to run on the 1st of March each year using a cron expression.
I thought this was the correct syntax, but Jira doesn't accept this.
0 1 1 3 * *
Can anyone give me some pointers on where I might be going wrong - thanks.
Thanks for help. I didn't want to sign up to the above site, but I did find the following from your advise: http://www.cronmaker.com/ which gave me the answer.
https://crontab.guru/ has also been something that has helped with cron expressions. Thanks for this post BTW
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
some sample syntax's are thre on following doc
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.