Moving a single project from Jira 6.2.3 (at Kenai) to Jira 5.2.9

Hello.

As the subject says, I need to import issue data from the JIRA 6.2.3 installation at Kenai (that is going to be shut down) to my own JIRA instance. I need to do that for a single project, because fortunately only a single project was not managed by myself.

Kenai provided some hints about exporting issues in CSV, but AFAIK this won't be good for re-importing into another Jira. I managed to export all the issues at Kenai in RSS format, but at this point I don't know how to processed. I'm aware of the capability of doing a full backup and restore (I've already done it in the past for a re-installation), but I don't think it's good for my needs, as it relates to the whole installation. Right?

Thanks in advance.

1 answer

0 votes

You could take the full backup and use "project import" to import just that one project.  But you will need to close the config of the project manually before doing the import.

Suggest an answer

Log in or Sign up to answer
Community showcase
Published Nov 27, 2018 in Portfolio for Jira

Introducing a new planning experience in Portfolio for Jira (Server/DC)

In the past, Portfolio for Jira required a high degree of detail–foresight that was unrealistic for many businesses to   have–in   order to produce a reliable long-term roadmap. We're tur...

2,693 views 18 21
Read article

Atlassian User Groups

Connect with like-minded Atlassian users at free events near you!

Find a group

Connect with like-minded Atlassian users at free events near you!

Find my local user group

Unfortunately there are no AUG chapters near you at the moment.

Start an AUG

You're one step closer to meeting fellow Atlassian users at your local meet up. Learn more about AUGs

Groups near you