I would like to get insight into how much of our sprint is dedicated to each epic. I am trying to achieve this with a pie chart gadget. I have a filter for the current sprint using "project = "my team" AND Sprint in openSprints()". But I have no statistic for epic name or epic link.
Should I configure something on the system level to enable this? Or should I use some other form of reporting?
If you don't have the option to do this in a pie gadget, you could export the results of a filter to excell and then build a pie chart that shows the size of each epic in a pie chart. I often have to do this to expand the reporting of JIRA when the website doesn't provide the level of detail that I need.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.