Hi,
We are currently using JIRA 5.1.3.
From my CSV file I am trying to import into a project, multiple work log entries that are associated to a single issue. The only option available, when doing the import is 'Work Log (in seconds)'.
Is there a process for capturing this information?
kind regards
Amrik
Hi Amrik,
The Work Log field captures the time spent on a task. Are you trying to import time spent entries or text based updates?
https://confluence.atlassian.com/display/JIRA/Importing+Data+from+CSV - gives information on the types of fields and the methods of importing information into these.
Cheers
Dan