I can already import a csv file with the work log with worked time, as follows:
issue_key,pj_name,pj_key,Summary,Worklog
RM2FO-588,RM 2.0 FO,RM2FO,Desc1,Test;20110802;user;1800
But haven't found a way to import the billed time to the same work log.
Is it possible to import billed time in CSV?
image2015-8-22 1:3:19.png
If you want to import this into tempo with a check box that can be used for Billed time.. I think you are out of luck.
So
When I Log work manually the billed field is available, what you're saying is that I can't import both the worked and billed by CSV. Ex: worked = 150 min; billed = 120 min
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I think only via JSON you will be able to import into Tempo as it will need to be direct. Worked relates to Time Spent a JIRA field. I'm pretty sure it's not possible via CSV
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For historical data just create a custom field.. for this Billed Time and use the Billed Time in Worklog which is tempo going forward. You can still associate the custom field with a TEMPO export
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Worked = Time Spent (Native to JIRA) Billed is configured by Tempo?