Hello,
On my JIRA instance I have one Scripted Field which is calculated based on 2 other fields (simple matrix). I want to include this field in email notification template about created issue. I edited appropriate .vm files and sometimes this field is included in email notification and other times not.
As far as I know, Scripted Field is calculated after issue was updated. I think the problem is that sometimes that field is calculated before email is sent and other times after.
Is there any way to force calculation of Scripted Field in post function (before Issue Created event is fired)?
Thanks !
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.