Hello,
i want to create a custom field "Mean Time To Failure". Starting with 10000 hours. After 10000 hours i want it to be to 0. I want to get an E-Mail after that.
How can i realise that with ScriptRunner?
Thanks
Hi Johannes.
I don't think that is entirely impossible, but I don't think this is a good idea.
Option 1:
What you could do would be to add a hidden field with your desired date. And then add a scripted field that takes that date into the timestamp, and takes it to 0 slowly. However that would not work:
The thing with scripted fields, is that they are evaluated when the issue is viewed. Which is obviously a problem, because you would need to view an issue to trigger an event...
So you need to do one of these two things:
Create a scripted job to re-evaluate that field. Which is a bad idea. Or:
Option 2:
Remove the second scripted field, and create a scripted job that calculates the time to failure a time of low load. That scripted field would basically take that date+10000 hours, and if any of the issues do step over that time, then send an email with each issue name.
---
The second choice would be my recommendation. Might be a bit difficult. Also, this isn't quite what JIRA is for, might not be worth the effort.
Cheers!
DYelamos