How can I have a visual indication of how many days a subtask is in the status "In Progress" on the Scrum borad.

Matthias Mühlhausen October 22, 2015

As a Scrum Master I want to have an indicator if a task is too long in progress. This is an every-day issue in a Scrum process.

1 answer

1 vote
Jim Constant October 22, 2015
  1. Choose Configure from the Board dropdown menu
  2. Click Columns on the left hand side of the screen
  3. Check the Days in Column checkbox

You'll then see small dots on each subtask card showing how long they've been in the column their in. Hover over them to see an exact number of days. 