As a new user I created several tasks and they are designated as components. I don't know how to move them from the components page to the backlog.
How can we do this? With the tasks on the components page, I can't add them to sprints. Or I can't see how that's possible.
Thank you.
Tasks are not "designated as components". A task is something that needs doing. A component is a tag you stick on issues to help you sort our parts of a project.
The backlog is a pile of issues (tasks) that need doing. The backlog is defined on a board by the filter.
If your tasks are not appearing in the backlog, then the filter for the board is not selecting them. I'd start with a look at that. ( One perfectly valid filter for a board might be "project in (x, y, z) and component = 'thing'", but most tend to be "project = x")
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.