Hi ,
We are using Jira 7.13.9 . In lower env we tried to sync AD using Microsoft Active Directory connector . We are able to synchronize with AD successfully, but users groups and project level access are created in internal directory is getting removed . Is there a way to retain internal directory groups and project level access post synchronization also . Please advise.
Are the group names the same in the internal directory as in Active Directory? Jira cant not have 2 groups with the same name, and it can not "merge" them
You can control the order by making your internal directory higher/lower priority by moving it up and down in the list. I believe first one wins.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.