Capacity calculation on Portfolio JIRA

Tazeen Riaz September 17, 2019

I am using Portfolio JIRA for capacity planning and my stories are estimated on story points.

I understand that when the estimation is at story point level then the per person capacity is at team level which is velocity divided by total team size. My ques is if I have allocated story points to a story and the story is assigned to a tam member, why that story point does not show up on the capacity tab. for ex if X has a story assigned to him with 10 story points. These 10 story points does not show up consumed by X when we see team section of portfolio, It just calculates default velocity,

 

2019_09_17_10_19_04_Samsung_196974_Portfolio_for_Jira_Jira.jpg

0 answers