Create
cancel
Showing results for 
Search instead for 
Did you mean: 
Sign up Log in

It's not the same without you

Join the community to find out what other Atlassian users are discussing, debating and creating.

Atlassian Community Hero Image Collage

Upgrade from JIRA 6.2.6 to 7.13

Currently, I have JIRA 6.2.6 and need to upgrade to 7.13.2 (and to 8.5 later). Current Prod is a Windows server 2008 Physical server and current Test is a VM. I will have 2 new VMs to work with. I am considering starting with a P2V of our Prod system, and then using that VM for upgrade to 6.4.  ... then 7.0.11, still on Windows Server 2008. We will then migrate the 7.0.11 to one of the new VMs with Windows Server 2012. And then, upgrade to 7.13.2.

Alternatively, we could perform an in-place upgrade of 6.2.6 to 6.4, and then do the P2V, or new install migration to the VM, and then follow with upgrade to 7.0.11, as above.

One concern is that we need to keep our Prod JIRA up during all the upgrade testing and can only have downtime for the final upgrade on the Prod VM.

Please advise.

 

Comment

Log in or Sign up to comment
TAGS

Community Events

Connect with like-minded Atlassian users at free events near you!

Find an event

Connect with like-minded Atlassian users at free events near you!

Unfortunately there are no Community Events near you at the moment.

Host an event

You're one step closer to meeting fellow Atlassian users at your local event. Learn more about Community Events

Events near you