On my Project board in the epic panel I can the the progress for an epic in percent based on story point estimation, see picture below:
Screen Shot 2017-02-17 at 12.55.42.png
The percent value is visible when you hover over the progress bar.
My question is:
Can I have that percent value in an issue filter as column?
Anybody here who can direct me to an addon and a small example, how to calculate custom fields and maybe docs what possible fields there are?
Scripted calculated custom field is the only way for this requirement.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Do you have any link for me how to start here? Is a plugin needed? Are there docs for scripted calculated custom fields?
Googling this mostly tells me there are a lot of plugins that achieve this. Is there a right one for this?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
All googling points me to several plugins. Is that really the way to go? Or is possible with JIRA out of the box?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.