I have a project where I need to limit worklog hours to no more than 2 hours.
Is there any way to do that? In pure JIRA or with the help of any plugin? (we have Tempo installed and Script Runner). ?
Interesting. Have a look at the Behaviours module in ScriptRunner. Maybe you can hide the Time Log field based on existing time logged?
https://scriptrunner.adaptavist.com/4.3.0/jira/behaviours-overview.html
Thank you for your answer. Actually hide worklog is not an option, as we're not using JIRA worklog (I have already hid it) and allow to worklog only throug JIRA Tempo Timesheet worklog window.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
BTW, even without worklog field you can always press more button and show WorkLog Screen.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.