If I run two concurrent deploys to elastic beanstalk using version 0.2.1 of the elastic beanstalk deploy pipe I get a rate exceeded error from AWS. Is there a way to slow down the polling of DescribeEnvironments in the pipe?
Error:
An error occurred (Throttling) when calling the DescribeEnvironments operation (reached max retries: 4): Rate exceeded
I've added a new option WAIT_INTERVAL to version 0.2.3 of the pipe.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.