Plan build minutes getting consumed on local runner builds
May 4, 2021 edited
Hi,
I've noticed that our plan's build minutes are being used, even though all builds were run with a local runner. Currently 171 build minutes were used. Behavior is reproducible.
Yeah it looks like the same is happening to me as well. Only ever used our on-prem runner this month and yet the repo with the runner is reporting used minutes.
2 comments