I want to set up some expiry global rules, though I am missing answer to really import question for me. Minimum buils to keep will be checked against all plan builds or all plan branches builds?
In other words: How many build results would remain in following case?
Expire after: 2 weeks
Minimum builds to keep: 5
Number of plan branches: 2
Both plan branches have builds older then 2 weeks. Every plan branch have 10 build results stores (20 in total).
I expect that answer is: in both plan branches 5 build results will remain (10 in total). Though there is a chance that this mechanism is taking number of builds in whole plan meaning it would leave 5 builds in total (not sure how many build in which plan branch).
Hi Daniel!
You are right! The Minimum builds to keep number is valid for every branch. In this scenario, 10 results will remain (5 in each branch).