Change Epic Link Doesn't Work

David Coyle October 3, 2016

To reproduce:

  • Create a story
  • Associate it with an epic using drag and drop on a scrum board
  • Open the same story.  Click edit.
  • Change the epic link to a different epic.
  • Click update

Expected result: epic link changes to new epic

Actual result: epic link doesn't update

We have a JIRA Agile license.  I have full permissions on all projects.  Our JIRA software version is 7.1.2.  



 

 

 

1 answer

Suggest an answer

Log in or Sign up to answer
1 vote
David Coyle February 23, 2017

Response from JIRA support:

"Checking the main screen used for editing issues on projects (General Issue Create Edit Screen), we were able to identify that the field Epic Link was present on both Basic and Detail tabs. As fields are meant to show up only once per screen, this was causing JIRA to become lost when it came to change the value, as it had the new value in one field and the original on another. Navigating to the screen configuration and removing the extra Epic Link field from either tab resolved the issue. Note that after this is done, a page reload on the issue will be necessary for it to take effect. I also suggest reindexing JIRA after this field modification is done."

Victor Alvarez October 18, 2017

Thank you. Your solution has helped me